top of page
Blog Post
Search


CNW's Alco Line. Phase 2 Photo Gallery
A trio of faded RS3s rolls westward past the iconic station in Mankato, MN. The exquisite model was scratch-built by Jeff Kraker. Phase 2 of the Alco Line project is now complete. (Phase 1 was the cover story in the November issue of RMC). Phase 2 models Mankato and the regions just to the east and west. Join me as we take a photo tour of the latest progress updates. Here is the track plan. Phase 2 is in the middle of the room. After passing the station, and continuing
Dec 31 min read


Modeling Hubbard Feeds
The yard switcher spots a load at a scratch-built model of Hubbard Feeds in Mankato, MN on the HO scale Alco Line project. As much as...
Sep 263 min read


Scratch Building
Heading eastward across Forest Avenue, Guilford's local works the Bishop Street Branch on one of my custom-built commissions. The vast...
Aug 312 min read


The Chester Valley RR, Track Plan of the Month
In the November 1939 issue of Model Railroader, there was an excellent layout design put together by J. Harold Geissel. Just for fun, I...
May 101 min read


Weathering A CNW Alco
CNW RS-3 no. 1616 warms up on a cold morning in Tracy, MN in preparation for its run to Sleepy Eye. Follow along as I walk you through...
Apr 142 min read


A Chilly Morning in Tracy
It's September of '78 in Tracy, MN and things are getting to the point where you can start feeling a chill in the air when the shift...
Apr 41 min read


Working Elevator Row in 1970s Tracy
It's a late summer afternoon in 1978 as a CNW RS-3 does some clean-up work on the elevator lead behind the yard in Tracy, MN. The...
Mar 221 min read


Solo Ops on The Alco Line
The turn out of Tracy carefully spots a load of canning supplies at door 2 at Del Monte's Plant 114 in Sleepy Eye. A tank of vegetable...
Jan 204 min read


Alco Line Project - The Design
Model Railroad Layout Design For The Alco Line Project (HO Scale) Construction on The Alco Line Project has started. As work progresses...
Dec 18, 20244 min read


CNW's Alco Line Layout Project
An Alco 424 spots a car in front of Sleepy Eye Milling Company in Sleepy Eye, MN. I'm currently building a segment of this fascinating...
Nov 22, 20241 min read


Car Storage
Floating shelves can be an efficient means of storing rolling stock. You don't need to be in the hobby long before you've accumulated a...
Nov 19, 20242 min read


The Link Between Your Approach to Structures and Layout Design
This logistics warehouse is a composite of no less than eight Walthers kits. Being willing to alter a kit's footprint opens up an...
Aug 21, 20243 min read


BNSF Hi-Line In N Scale
I recently finished an N scale model railroad based on the BNSF Hi-Line through Montana. The layout, 7 feet by 22 feet in size, features...
Jun 28, 20241 min read


More Horse Before the Cart Talk
Conductors don't have wings. They can't fly. In this view, the conductor is taking a final look at his work before walking back to the...
Apr 21, 20242 min read


Settling or Focusing?
Settling versus focusing, it’s the most common issue I see in my design practice. Not being able to make the distinction between the two...
Apr 12, 20244 min read
bottom of page


